Projektbericht
PROJECT REPORT

Optimization of the value chain in CHP production

  • Disruptions in the production and value chain identified
  • Phase model developed and implemented for project managers
  • New processes for materials management and production
Ein krisenerprobter CRO.

Crisis-tested CRO for SMEs

  • Crisis management, reorganization, restructuring, repositioning
  • Restructuring in insolvency and sale out of insolvency
  • Negotiations with works councils and trade unions on redundancy plans, related reconciliation of interests and collective restructuring agreements

The interim manager was commissioned by a manufacturer of combined heat and power plants (CHP) to fundamentally restructure its production and sales processes. In his mandate, he acted as CEO.

Numerous disruptions to the production and value chain

The customer structure of the mechanical engineering company is very heterogeneous. For example, the CHP units are supplied to the agricultural sector for biogas generation or greenhouse heating, to energy suppliers (local and district heating, heating centers, swimming pools) or to industrial companies (process heat, cooling, electricity, steam) as well as mining (mine gas generation, mine gas compression) and waste management (landfill gas generation, organic waste fermentation). As a result, customers primarily order individual CHPs.

An analysis by the interim manager revealed numerous disruptions to the entire production and value chain ("order-to-cash" process). In costing, for example, there were no appropriate specifications from the management board - and the sales department concluded contracts before all technical requirements had been finally clarified.

Phase model for the project managers

In production, the project managers were not sufficiently involved in the purchasing of the components required for the construction of the BKHW. There was no continuous process and plan coordination. An organizational chart was only partially available and the strategy for the operational departments of the divisions did not exist. In addition, internal communication was rudimentary at best.

In order to organize the processes, the interim manager developed a phase model for project execution. He organized the value chain by identifying "gates" for the project managers and defining "gate reviews" - for the following areas:

  • Project plan / projectKickoff / processing of supplements
  • Tracking receipt of down payment invoices
  • Definition of main components
  • Continuous costing control
  • Determination of necessary internal expenses
  • Coordination of test / acceptance / commissioning
  • Documentation / handover to service
  • Receivables management

New processes for materials management and production

In addition, the interim manager implemented the following processes and requirements in materials management. Requirements:

  • Exclusive procurement authorization (not bypassing purchasing!)
  • Determining and updating delivery times for key components
  • Controlling liquidity via conditions management
  • Daily scheduling of the necessary forwarding agents including packaging teams

In production, the interim manager initiated numerous processes that, above all, enabled clear workflows. This included personnel scheduling that integrated the temporary workers. He identified the production of certain components as bottlenecks and outsourced many of them to suppliers. The interface to shipping was also redefined.

Production meetings and business reviews

The interim manager introduced weekly production meetings and monthly business reviews for the materials management and production managers. The production meetings served as a coordination forum for all projects in the company. The business reviews focused on the overall progress of the project and the company's own contribution to the results. Alternatives were evaluated in the reviews and operational performance and strategic positions were linked.

Economic and organizational success

The phase model was ultimately successful in ensuring the complete and economic fulfilment of customer orders. Control through "gates" and "gate reviews" proved to be practicable, also thanks to the transparent presentation of processes and clear responsibility in the process.

The economic results following the optimization are clearly positive. Delivery reliability has improved significantly. Stock levels in production have been reduced by 65%. The material return from the CHP construction sites now supplements 95% of the material balance from the bill of materials, construction site stock and assembly stock. All critical deadlines were met without exception - to the day.

read more read less
Ein krisenerprobter CRO.

Crisis-tested CRO for SMEs

  • Crisis management, reorganization, restructuring, repositioning
  • Restructuring in insolvency and sale out of insolvency
  • Negotiations with works councils and trade unions on redundancy plans, related reconciliation of interests and collective restructuring agreements
Created and translated with the support of AI on 30.08.2026
Last updated on 16.04.2026

Projects
by this manager

Produktion Sanierung

Production of pneumatic seals reorganized

A company for the production of seals for use in pneumatics (industrial and automotive) was experiencing a negative trend in results despite stable production conditions over a long period of time. The interim manager was commissioned to analyze the situation and set up a restructuring program...
454_1303_projektl_restr_sanie_maschinen_anlagen

Project manager for restructuring and reorganization in mechanical and plant engineering

The interim manager took over responsibility for the restructuring and reorganization of one of the two locations in southwest Germany for a company in the mechanical and plant engineering sector...
Ein Symbolbild für Insolvenz in Eigenverwaltung.

CEO for insolvency in self-administration (mechanical engineering and toolmaking)

The client was the owner of a group of companies involved in toolmaking and the manufacture of components for machine tools. The company had two active and one inactive site in the Allgäu region. The interim manager took over the management ...

draht

Process optimization in the production of special wires

The interim manager was commissioned by a manufacturer of specialty wires. The company's products are used in wire erosion, electronics, welding and soldering. The aim of the interim mandate: A high level of plant availability was to be ensured in production...
526_101821_transformation_industrial_packaging_handling

Restructuring and transformation of an industrial group

In May 2021, the interim manager was commissioned by a medium-sized industrial group based in Germany - Industrial Packaging and Industrial Handling...